Lighthouse Construction Pictures!
Click a picture to supersize it.
Home |
| April
22, 2010 Materials Pickup at Lowes |

Marc and Steve (I took the picture!) |
 |

Storage! |

Steve's Snowblower. Has nothing to do with building a Lighthouse but
it's way cool! |
| April
27, 2010 Construction begins! |

Base Cutting |
 |

Steve Cutting out side panel wall. Note 22.5 degree angle on the saw! |

Base Test fit. Looks good! Off by 1/4 inch but that's not too bad. |

Steve testing the wall fit. Once again looks good! |
|
| May 4 2010 Start time ~6:30 pm |
| |

Base shown upside down. About to attach 2x4s that hold the two halves
together. |

Steve cutting the cleats for the top and bottom of the base. |

Side walls all cut! Good job Steve! The edges are even cut at an angle! |

This is our left over wood. Lots of other parts will be made from this
wood. |

That's me sitting on the assembled base. |

Finally the base with the cleats attached.
Quitting time ~10 PM! |
| Wednesday May 6, 2010 6-10
PM |

I got the holes drilled for the wall bolts and then Steve and I hung
the walls. |

That's me being a door. |
| Saturday May 8, 2010 8:30
AM-10 PM |

Started by cutting the top and bottom of the Watch room assembly. This
tool is cool! |

Here is one of the two panels before I cut the hole in it. |
 |

The cleats get attached to the rings. |

Finally ready for some assembly! All the windows were cut too! |

Getting ready for the top! |

More help! |

This is the roof being constructed. I'm not happy with the way I
fastened the panels to the base so it's back to Solid Works to tweak the
design! |

Another view. |
Not Shown: 1. Steve and I cut all 8
cleats for the base walls. Now we can fasten them to the walls and the
bolt the walls together.
Quitting time! |
| Monday May
10 2010 (and Sunday) |

Ok I saw these cool powder coated aluminum balusters to they got added
to the project. The smooth look will look very professional! |

Here are some of the assembled railings. Basically I set up my drill
press and drilled all the holes at even debths. |

Steve needed a string so we could make the arc for the doorway. I
happened to have one on my T41 jacket! |

Ready to cut! |

Here we see the wall cleats installed. The walls really took shape once
they were installed. Steve's ability to cut an angled line in the
plywood walls really showed! |

The doorways completed! The finish came out just like the Solid Works
model showed! |
 |
|
| Tuesday May
11 |

The day team took over and finished the roof! |

The Doghouse base was also started!! |

Steve is putting the icing on the cake and showing off his his roofing
skills! I'll add a close up later. |
|
| Wednesday
May 12 |

The roof is done! |

Steve and Karen |

Me , Steve and a railing! |
|
| Wednesday
May 13 |
| Marc and Ricky tweaked up the
doghouse door today. I had a miscalculation on the side wall length and
that caused the wall to be a little too short. We compensated by
shortening the base by 4 inches. |

The night crew came in! Me and Jim got to work on the doghouse while
Steve manicured his lawn which was well over due because of the work he
has been doing on this crazy project.. |

Here's Steve's Lawnmower. Cool! The blades are underneath somewhere. |

That's me in the Doghouse! Sandra is going to make me sleep there if I
keep working on this project! |

We got the 4 walls up and 1 roof panel! Everything can be taken apart vi
the wingnuts! (The other Wingnuts) |

One more panel to make! I'm going to try and use a few pieces of Plywood
so we don't have to go buy another panel. So far we have used all the
panels of plywood we bought. |
|
| Saturday May 15 ! Moving
Day!
I finally brought my better camera to take some pictures today! Of
course I forget to take it with me when we dropped off the parts.
9 AM- 4 PM |

One Light house base with a Dog House attached. |

I got this side roof finished this morning. |
 |

Ricky and Ryan.. And the walls come tumbling down... Marc is behind a
wall. |

This is half the load!
|
 |

And the other half is in Ricky's truck. |
 |

One Disaster Area!
It took about 2 hours to clean up this but now it looks great! Too
bad I didn't take a picture. I can't believe all the little scraps of
wood we generated in 1 week. |
This page left blank.
(we needed some space) |

The parts are now at our Scout House ready to be taken outside to be
sanded and primed and painted. |
 |
 |
 |
| Sunday May
16 Priming Day! |
 |
 |
 |
 |
 |
 |
May 17 - May 21
- Finished windows ( 1 night Steve and Mark)
|
| Saturday May 22 2010 I
don't have any pictures for Saturday but it was a big group effort and
lots of progress was made on priming and painting most of the parts. |
| Sunday May 23 2010 |

The Doghouse with all the trimmings! |

Marc and some of the many railing painters. |
 |
 |
 |
 |

it's Prime time! |
 |
 |
 |
 |
 |
 |
 |
 |
| Monday May 24
7-9:30 PM |
 |
 |
 |

Danny trimming the dog house. |

In progress. |
|
| Tuesday May 25 7-10 PM +
afternoon work |

Steve trimming the shingles! |

One Doghouse dressed up! |

Sign mounted. |
 |

Marc counting his wingnuts! |

Always trim your nails! |

What's behind the door. |

Got the railing fininshed! |

The railing separates into two sections and has two removable sections. |

Test fit. |
 |

Looks good! |

Finally down at Camp Squanto ready to get packed on the truck to
Jamboree! |
| |
|